Waste Water Management
The company has a sewerage scheme with an estimated capacity of 2,000m3/day. The facilities consist of waste water stabilization ponds located about 2km east of the town at Kiaigi (along Karatina-Kerugoya road) and a pumping station at Kirigu along the Karatina-Nyeri highway.